
Interior Renovations
Bathroom Renovations
From demolition to the last bead of silicone — one team, one plan.
Overview
What changes for you.
A bathroom renovation involves more trades in less space than any other room. Demolition, plumbing, electrical, waterproofing, tile, fixtures and finishing all need to happen in the right order.
We plan the layout and selections with you up front, and keep the work area protected from the rest of the home.
A room that works
Storage, lighting and layout planned around daily routines.
Built to stay dry
Waterproofing and ventilation done right behind the finishes.
One accountable team
No juggling a plumber, tiler and finisher yourself.
Scope
What's included.
- Full demolition and disposal
- Plumbing and electrical, where an appropriately qualified trade may be required
- Waterproofing and membranes
- Floor and wall tile
- Shower and tub installation or conversion
- Vanities, countertops and fixtures
- Lighting and ventilation upgrades
- Paint, trim, mirrors and accessories
Your written proposal confirms the exact scope, materials and exclusions for your property.
Before you start
Worth knowing up front.
Selections early
Choosing tile, vanity and fixtures before demolition keeps the schedule moving and avoids lead-time delays.
Layout changes
Moving a toilet or drain adds plumbing work. Keeping the layout usually costs less.
Second bathroom
If this is your only bathroom, we plan the schedule to keep downtime as short as possible.
Process
How the work unfolds.
Design
Layout, selections and itemized proposal.
Demolition
Protect the home, remove to the studs where needed.
Rough-in
Plumbing, electrical and waterproofing.
Finish
Tile, fixtures, vanity, trim and cleanup.
FAQ
Bathroom Renovations: common questions.
How long does a bathroom renovation take?
It depends on scope, layout changes and material lead times. Your proposal includes a schedule before work starts.
Do you handle plumbing and electrical?
Where regulated plumbing or electrical work is required, an appropriately qualified trade may be required as part of the project.
Can you work with fixtures I have already bought?
Usually. We confirm compatibility and rough-in requirements before demolition.
Request a quote
Tell us about your project.
Share a few details and we'll follow up to arrange a site walk. Every quote is written and itemized.
Keep exploring
More from Interior Renovations
Showers & Tub Conversions
Walk-in tile showers, tub-to-shower conversions and new tubs, built on proper waterproofing.
Explore shower / tubVanities, Fixtures & Finishing
Vanities, faucets, toilets, mirrors, lighting and trim — the finishing upgrades that change how a bathroom feels.
Explore vanity / fixtures / finishingTile Flooring & Tile Work
Floor and wall tile with planned layouts, flat transitions and proper waterproofing where water is involved.
Explore tile